As part of a new collaboration with a globally active façade company, we successfully supplied structural cross bracing elements for a high-rise building project abroad. Approximately 2,000 carbon steel tension rods were delivered to be used specifically within the elevator shafts, providing essential structural support.
This project was carried out in partnership with our UK-based solution partner Macalloy, and the rods were manufactured in M12 and M16 diameters, with lengths varying between 2.5 and 4 meters. Each rod is equipped with a turnbuckle, allowing for precise tension adjustment within the system.
These cross bracing systems are designed to enhance structural stability in critical areas such as elevator shafts, especially in tall buildings. Throughout the process, full compliance with engineering standards and project-specific requirements was ensured.
With our specialized structural solutions for the construction sector, we continue to contribute to global projects by delivering performance, safety, and reliability.