We have supplied Tie Rods to Canakkale Bridge Project to be used for ground reinforcement at dry dock area where the bridge decks will be stocked. We have prepared a sample design with our business partner from Germany, ASF Anker. Upon confirmation, we supplied the Tie Rod Systems. The length of Tie Rods to be used is around 14 meters.