We are very proud to be a part of Yusufeli Dam Project which broke ground in 2013 in Karadeniz Region, 70 km southwest of Artvin on Coruh River. Yusufeli Dam is Turkey’s highest and the world’s third highest “double curvature thin arch dam” and is being built by Turkish engineers and with Turkey’s own resources. When completed, Yusufeli Dam will have 540 MW installed power and produce 2 billion kWh electricity fulfilling needs of almost 2.5 million people.
Being a part of a very prestigious project at this magnitude, we have supervised installation and tensioning of 280 ground anchorages with M50 diameters and 6000mm lengths.